انتخابات التجديد النصفي الأمريكية · 2026
  1. الولايات المتحدة
  2. فرجينيا
  3. مقاطعة Spotsylvania
  4. الاستفتاءات
  5. Spotsylvania County: Enviromental and Solid Waste

علم فرجينيامقاطعة Spotsylvania, فرجينيا · استفتاء

Spotsylvania County: Enviromental and Solid Waste

استفتاء

مقاطعة Spotsylvania, فرجينيا

لم تُعلن النتائج

Question 4: Shall the County of Spotsylvania, Virginia (the "County") contract a debt and issue its General Obligation Public Improvement Bonds in the maximum amount of Thirty-Three Million Six Hundred Fifty-Seven Thousand Three Hundred Fifty-Three Dollars ($33,657,353) to provide funds, together with other available funds from the County or other sources, if any, to undertake a program of capital improvement projects for environmental and solid waste management, including without limitation (1) mandated closure of Cells 3 through 6 at the Livingston Landfill including final grading, protective cover systems, and environmental controls to ensure compliance with state and federal environmental regulations; (2) construction of Cell II-C at the Livingston Landfill to provide additional mandated permitted waste disposal capacity; (3) excavation, processing and recovery of airspace at Livingston Landfill site to extend landfill service life and mitigate long-term environmental liabilities; and (4) improvements to convenience centers to improve residential access to solid waste and recycling services including enhanced safety features and upgraded site infrastructure?

  • نعم––
  • لا––
لم تُعلن النتائج. تبقى الأرقام والأشرطة رمادية حتى صدور الأرقام الرسمية.

المصادر1

عن هذا السباق

المنصب
استفتاء
المستوى
الاستفتاءات
مصدر أسماء المرشحين
مرشحون معتمدون
النتائج
لم تُعلن النتائج
المقاطعات
Spotsylvania

المزيد من الاستفتاءات

أسئلة وأجوبة

ماذا يطرح Spotsylvania County: Enviromental and Solid Waste؟

Question 4: Shall the County of Spotsylvania, Virginia (the "County") contract a debt and issue its General Obligation Public Improvement Bonds in the maximum amount of Thirty-Three Million Six Hundred Fifty-Seven Thousand Three Hundred Fifty-Three Dollars ($33,657,353) to provide funds, together with other available funds from the County or other sources, if any, to undertake a program of capital improvement projects for environmental and solid waste management, including without limitation (1) mandated closure of Cells 3 through 6 at the Livingston Landfill including final grading, protective cover systems, and environmental controls to ensure compliance with state and federal environmental regulations; (2) construction of Cell II-C at the Livingston Landfill to provide additional mandated permitted waste disposal capacity; (3) excavation, processing and recovery of airspace at Livingston Landfill site to extend landfill service life and mitigate long-term environmental liabilities; and (4) improvements to convenience centers to improve residential access to solid waste and recycling services including enhanced safety features and upgraded site infrastructure?

متى الانتخابات؟

يوم الانتخابات هو الثلاثاء 3 نوفمبر 2026. تُغلق مراكز الاقتراع في أوقات مختلفة في كل ولاية؛ وتظهر النتائج هنا فور نشر كل مكتب انتخابات أرقامه الرسمية.

متى تتوفر النتائج؟

ليلة الانتخابات، فور نشر كل مكتب انتخابات في المقاطعة والولاية أرقامه. وحتى يُعلن السباق نتائجه يظهر بلا نتائج، وليس صفرًا أبدًا؛ وتبقى النتائج غير رسمية حتى التصديق عليها.